Wednesday | 9 July, 2008
Computerworld

Games developer upgrades to 10 gig switching
Storage is the new bottleneck
Sandra Rossi 03/08/2007 11:45:03

Related Features
  • +

    Strategies for Dealing With IT Complexity 24/12/2007 10:30:47

    Every innovation, every business process improvement, comes with an IT complexity tax that must be paid by CIOs in time, money and sweat. Here are strategies to mitigate the increasing complexity of IT as it enables new business.
    Every innovation, every business process improvement, comes with an IT complexity tax that must be paid by CIOs in time, money and sweat. Here are strategies to mitigate the increasing complexity of IT as it enables new business.
Additional Resources
Executive Guides
Whitepapers
Zones
Zone logoZones provide focussed content from Computerworld and leading technology partners.

Newsletter Subscription

Sign up for our Computerworld newsletters!
Computerworld's twice-daily news service keeps you in touch with the latest, most important headlines from Australia and around the world.
Keep up with the latest virtualization technologies, products, news and features.
RSS Feeds

Australian video game developer, Krome Studios, has completely re-engineered its network as part of an upgrade to 10 Gigabit switching.

The company's IT manager, Jason Muir, said the aim of the upgrade was to increase throughput over the backbone as games development is extremely taxing on bandwidth.

"Plus we have a lot of high-powered machines in a small space sharing large amounts of data," he added.

Krome has two adjacent offices in Brisbane and further sites in Melbourne and Adelaide, employing 300 staff in total.

After the initial research and planning, Muir approached reseller Computer Alliance to supply the equipment.

"We wanted to improve throughput speed for the entire business," Muir said.

"To stack the old switches we were having to sacrifice two ports on the front, and suffer the hit to our throughput.

"The new 10 Gig switches have dedicated stacking modules which plug into the back of the switch so we are not sacrificing ports when stacking and we get vastly improved throughput with 10 Gig."

The last step of the rollout was connecting the two Brisbane sites.

To link the Brisbane buildings, Krome dug up the road and laid down a dark fibre link, running the 10 Gigabit backbone across it.

All up, Krome installed five 10 Gigabit Managed Switches from Netgear as the main backbone switches and linked these to ten Gigabit Managed Switches, distributed across the four sites.

"Before we called in the diggers, we trialled a wireless solution to connect the two Brisbane offices," Muir said.

"Using multiple access points tied together with a bridge, we found they were unable to get enough bandwidth support between the two sites to meet our requirements.

"This solution was abandoned in favour of the dark fibre link."

Muir admits it was a big financial commitment for Krome, but essential to support the expansion of the business.

"We invested between $65,000 and $70,000 on switches and even though we have always been a Netgear house, we found Netgear offered the best price for what we were after anyway," he added.

Netgear techie Thomas Leggett said during the rollout there was one speedbump, that is a non-responsive switch.

"Our tech support team quickly arranged a replacement unit to be shipped to Krome and the upgrade proceeded," Leggett said.

"Individual components in a piece of hardware are usually quite expensive and if the product is under warranty, its easier and of course cheaper to replace the entire unit.

More about Netgear, VIA, PLUS, NETGEAR, Speed
Market Place

Computerworld Member Login


 

Beyond Virtualisation - The Roadmap to 2012

CIO Breakfast Briefing
8:30am - 10:30am

Brisbane | 22 July | Sofitel Brisbane
Sydney | 23 July | Four Seasons Hotel
Canberra | 24 July | The Hyatt

Attend and discover:

  • What happens after virtualisation
  • The benefits automation drives
  • When automated infrastructures will emerge
  • What the roadmap to 2012 looks like
  • How to deliver an automated architecture
  • How to maximise your investment in virtualisation
Whitepaper

Best Practice IP Storage: Long Distance, Short Money

Storage over IP, or the replication of block-level data over leased virtual private networks, allows users to select the type of wide-area service that best meets their budget and application requirements. Discover the best questions to ask IP SAN vendors, the cost savings that can be created by using IP storage methods and the future of iSCSI.

Enterprise IT Buyer's Guide
Find Technology Vendors Fast
 
Find vendors by name | Find by category
Sponsored Links