The ideal datacentre: No low-hanging green fruit
How do you make datacentres more power-efficient?
Chris Mellor (Techworld)  06 September, 2007 10:28

Making data centres more power-efficient is becoming a mantra of modern IT practice. Whether it is to reduce electricity costs, to get around supply limitations, or to become friendlier to the environment there are a lot of IT directors, equipment suppliers, research and analyst houses and green lobby and pressure groups all singing off this same hymn sheet.

Let's assume you have a datacentre that's more than five years old, one with lots of servers, storage arrays, internal and external network boxes, a raised floor with power and data cabling underneath, air-conditioning with a chiller outside, fire suppression equipment and so forth.

Generally speaking it works but you are finding you can't get any more power delivered to it, and/or it's now full up of rack cabinets and stand-alone equipment, and/or its power supply is costing too much; there is too much equipment to power and keep cool. What can you do?

We can break the problem down into six different areas:

  • The room structure and layout
  • The power supply
  • The cooling infrastructure
  • Servers
  • Storage
  • Networking

Where can you direct your attention to get the most cost-effective return on any power reduction activities, bearing in mind that the data centre has to keep operating while you do this?

Datacentre infrastructure

Suppliers such as IBM have terrific datacentre renovation technology. It has great experience and can build new datacentres or renovate existing ones to embrace the latest ideas for power, cooling and layout so as to reduce power needs. But this is in the big bucks area and means wholesale datacentre remodelling. Obviously the datacentre equipment is out of action while this is being done and a major project is involved.

We can't really classify this as low-hanging fruit on the green tree though.

Hot aisle/cold aisle design is a way of improving cooling effectiveness by separating cold and warm air flows. It obviously means resiting equipment in racks so that fans blow the same way. You have to fit blanking plates to cover empty-rack spaces. It means that the equipment is out of action while you do this. Doing it on its own takes you so far but combining it with clearing under-floor obstructions and putting cabling along the tops of racks is better. The process then starts to look like a datacentre reconstruction though, with consultancy fees, engineering expense and a big project starts forming up. This is not a simple thing. Power supply and cooling

Power supply and cooling

Power supply companies are getting on board the green train and providing services and products to raise cooling and power-efficiency awareness. Emerson Network Power in the USA offers to survey your energy use. Its Liebert Data Center Assessment service analyses heat removal from sensitive equipment and evaluates electrical capacity and quality.

The assessment is done on-site and, using computational fluid dynamics, it creates a visual image showing datacentre air-flow, temperature, hot spots and zones that can negatively impact a computer's performance.

There are two components to the assessment: thermal and electrical. The thermal assessment takes air and temperature readings at specific points of a datacentre to identify the hot spots. Air-flow also is measured to pinpoint and draw raised floor air patterns, sub-floor obstructions and air flow through computer racks.

An electrical assessment will perform a single point of failure analysis to document weak spots. It will calculate the capacity of all switchgear from the main to mission-critical power distribution units, and measure the current being drawn through all UPS-rated capacity ratings. A harmonic analysis of the main breaker switchgear and load side of each UPS will be performed. The assessment also will determine kW and kVA loading on each UPS and compare it to the equipment's rating.

Computerworld Buyer's Guide - Vendors Matched to this Article

Comments

Post new comment

Login or register to link comments to your user profile, or you may also post a comment without being logged in.
The content of this field is kept private and will not be shown publicly.
Enter the fully qualified URL, eg. http://www.example.com/
  • Web page addresses and e-mail addresses turn into links automatically.
  • Allowed HTML tags: <a> <em> <strong> <cite> <code> <ul> <ol> <li> <dl> <dt> <dd>
  • Lines and paragraphs break automatically.

More information about formatting options

Add to Google
Computerworld Buyer's Guide - Vendors Matched to this Article
Zones
Zone logoZones provide focussed content from Computerworld and leading technology partners.
Newsletter Subscription
Newsletter Subscription
Sign up for our Computerworld newsletters!
Syndicate content
 

Computerworld Webinar

Thursday, June 11th, 2009
10:30am EST (Sydney, Australia)
Screening at your PC

Computerworld is hosting a 30 minute live webinar to help you to learn how unified communications can save you money, foster innovation and business agility by making it easier for people to find, reach and collaborate with one another.

Register Now

Computerworld Community Comments
Whitepaper

State of Internet Security

Spyware, viruses and other malware transported via Web sites represent the most serious data threat to companies today. Read on find out how you can appropriately leverage technology and appropriate business technologies to protect your business.

Enterprise IT Buyer's Guide
Find Technology Vendors Fast
 
Find vendors by name | Find by category
Sponsored Links
 
Send Us E-mail | Privacy Policy
Features List | Media Kit | Advertising | Contact Us

Copyright 2009 IDG Communications. ABN 14 001 592 650. All rights reserved.
Reproduction in whole or in part in any form or medium without express written permission of IDG Communications is prohibited.